Operations Management

MCQ cheat sheet · 149 questions · Units I–V

Unit I

OM Foundations, Strategy & Forecasting

Operations Management = designing, operating and controlling systems that transform inputs (men, materials, money, machines, information) into outputs (goods/services) at desired quality, cost and time.

4 Objectives of OM

ObjectiveHow
Minimise operating costsWaste reduction, efficient processes, supplier negotiation
Optimal capacity utilisationScheduling, inventory control
Improve qualityQC / QA systems
Maximise customer satisfactionTimely, reliable delivery

PPC — Correct Sequence

Routing → Scheduling → Dispatching → Follow-up
Exam trap Control activity in PPC happens after execution of the plan, not before.

Forecasting — Time Horizons

HorizonSpanUsed for
Short-range< 3 monthsScheduling, hiring
Medium-range3–6 months to 1 yrCapacity adjustment, budgeting
Long-rangeAbove 5 years / 3+ yrsManpower planning, R&D, capex
Exam trap Short-range forecasts are more accurate than long-range, not less.

Unit I — MCQ Flash Recall (30 Qs)

Q1. Operations Management is a ___ process.
Transformation
Q2. ___ is the core function of an organization.
Operations
Q3. ___ is the principle: understanding the current state of operations enables informed decisions and effective improvement.
Reality
Q4. Holding individuals/teams responsible for their roles and performance, promoting ownership, refers to the ___ principle.
Accountability
Q5. Training employees forms part of the ___ objective of Operations Management.
Improving quality
Q6. Achieving Optimal Capacity Utilisation does NOT include ___.
Keeping promises
Q7. Operations Management deals with the production of ___.
Goods and services
Q8. ___ processes are central to the operations system.
Transformation
Q9. Forecasting, capacity planning, scheduling, managing inventories, quality assurance, motivating employees, facility location are all ___ functions.
Operations
Q10. The organizational function consisting of all activities directly related to producing a good or service is ___.
Operations
Q11. Production Planning and Control (PPC) is crucial for cost savings and efficiency in ___.
Production
Q12. The process of deciding the path material moves from start to finish is known as ___.
Routing
Q13. The PPC function related to the timetable of activities is ___.
Scheduling
Q14. The correct sequence of operations in PPC is ___.
Routing → Scheduling → Dispatching → Follow-up
Q15. The control activity in PPC is performed ___ of the plan.
After execution
Q16. ___ involves anticipating bottlenecks in advance and ensuring smooth flow of production.
Production planning
Q17. ___ is responsible for the order of processing each activity under PPC.
Sequencing
Q18. ___ is concerned with the time required to perform each activity under PPC.
Scheduling
Q19. In manufacturing, cost can be kept under control through ___ reduction.
Wastage
Q20. A ___ is a combination of tools and procedures used to turn raw materials into completed products.
Manufacturing system
Q21. The act of assessing the future and making provisions for it is known as ___.
Forecasting
Q22. Operations-generated forecasts often do NOT deal with ___.
Sales
Q23. Which is NOT true for forecasting: short-range forecasts are ___ than long-range forecasts.
Less accurate (incorrect — they are actually MORE accurate)
Q24. The time horizon selected for forecasting depends on the ___ for which the forecast is made.
Purpose
Q25. A medium-range forecasting period is approximately ___.
3 to 6 months
Q26. Long-range forecasting periods may be approximately ___.
Above 5 years
Q27. To plan for future manpower requirements, ___ forecasting is used.
Long-range
Q28. Long-range forecasting is useful in planning for ___.
Research and Development
Q29. Medium-range forecasting is useful to plan for ___.
Capacity adjustments
Q30. An important factor in forecasting production is the ___ of machines.
Available capacity
◆ ◆ ◆
Unit II

Capacity, Location & Production Planning

Capacity Formula

Capacity = (Max production rate/hour) × (Hours worked/period)
Design capacity = max designed output rate. Theoretical capacity = achievable only under ideal conditions, short-term. Capacity flexibility = ability to rapidly shift production between products/services.

Location Analysis Techniques

TechniqueBest for
Factor RatingCombining quantitative + qualitative factors
Locational Break-Even (Cost-Volume-Profit)Pure cost comparison at known volume
Centre-of-GravitySingle distribution centre for multiple markets
Transportation Method (LP)Multiple sites feeding multiple destinations
Key driver Transportation cost is usually the dominant factor in a manufacturing location decision.

Routing vs Scheduling

Routing = deciding the path material/work follows. Scheduling = fixing the time/date for each operation. Routing+Scheduling is hardest in a Job Shop system. Gantt chart = the classic scheduling tool.

Unit II — MCQ Flash Recall (29 Qs)

Q31. ___ is the capability of manufacturing to produce goods and services.
Capacity
Q32. Capacity planning primarily helps to ___.
Save time
Q33. Of the factors affecting Capacity Planning, the LESS controllable one is ___.
Machine break-downs
Q34. Effective capacity is NOT influenced by ___.
None of the above (all listed factors DO influence it)
Q35. The ability to rapidly shift production capacity between products/services is called ___.
Capacity flexibility
Q36. Capacity = ___.
(Maximum production rate/hour) × (Number of hours worked/period)
Q37. Theoretical capacity is what can be achieved under ideal conditions for a ___.
Short period of time
Q38. Operational capacity planning approaches to balance customer demand with production capability include ___.
All of the above
Q39. Low-capacity utilization is a signal of ___.
Industrial sickness
Q40. The maximum designed service capacity or output rate is called ___.
Design capacity
Q41. Banks, fast-food chains, supermarkets and retail stores view locations as ___.
A crucial part of the marketing strategy
Q42. In the Factor Rating Method, which is NOT a managerial choice?
All of the above require managerial decision (trick option)
Q43. Which is NOT a step in the general location-decision procedure?
Gain government approval of location alternatives
Q44. The location-analysis technique that views the problem in economic terms is ___.
Cost-Volume-Profit (location break-even) analysis
Q45. A dominant factor influencing a manufacturing firm's location decision is ___.
Transportation cost
Q46. For global expansion, decision makers must be clear on benefits/risks/likelihood when identifying ___.
A country
Q47. You would establish a composite value for ___.
Factor rating
Q48. Mining, farming, forestry and fishing locate near raw-material sources due to ___.
Necessity
Q49. The method for locating a distribution centre that minimises distribution costs is ___.
Location cost-profit-volume (or Centre-of-Gravity) analysis
Q50. The crossover chart in location break-even analysis shows where ___.
Total costs are equal for alternative locations
Q51. ___ is the process of selecting the path each part of the product will follow.
Routing
Q52. ___ is fixing the time/date for each operation and determining the operation sequence.
Scheduling
Q53. ___ is a time-table specifying when each operation is started and completed.
Schedule
Q54. ___ involves fixing the path through which work will flow for manufacturing goods.
Routing
Q55. ___ is a time-table for performing activities, utilising or allocating resources.
Scheduling
Q56. Routing and scheduling is most difficult in this manufacturing system: ___.
Job shop
Q57. The Gantt chart is mostly used for ___.
Scheduling
Q58. The Bill of Materials (BOM) does NOT consist of ___.
Price of the part
Q59. Procurement cycle time is the time consumed for ___.
All of the above (sourcing, ordering, receiving)
◆ ◆ ◆
Unit III

Supply Chain, Vendor Rating & Purchasing

Typical Manufacturing Supply Chain

Supplier → Storage → Manufacturing → Storage → Distributor → Retailer → Customer

5 Core SCM Functions

Plan · Source · Make · Deliver · Return

Vendor Rating — QDP Method

ScoreFormula
Quality(Qty Accepted / Qty Supplied) × Weight
Delivery(Qty On-time / Qty Ordered) × Weight
Price(Lowest Price / Vendor's Price) × Weight
Terms VMI = Vendor Managed Inventory. RFI = Request for Information.

7R Principles of Purchasing

Right Quality · Right Quantity · Right Price · Right Time · Right Source · Right Place · Right Attitude

Purchasing Methods — Quick Match

MethodLogic
Speculative BuyingBulk buy in-season / when price is low
Hand-to-Mouth (JIT)Order only for immediate need
Scheduled BuyingStaggered deliveries per agreed schedule
Tender/Open TenderPublished bids in press/journals
Multiple SourcingMore than one supplier for an item

Unit III — MCQ Flash Recall (30 Qs)

Q60. The typical manufacturing supply-chain sequence is ___.
Supplier – Storage – Manufacturing – Storage – Distributor – Retailer – Customer
Q61. A ___ encompasses all activities associated with the flow/transformation of goods from raw material to end user, plus information flows.
Supply chain
Q62. A supply chain is a network of facilities that procure raw materials and transform them into ___ goods.
Finished
Q63. Information management is a function of ___ in operations.
Supply chain management
Q64. The ___ process has huge implications for running key operations in almost every organization.
Supply Chain Management
Q65. Supply-chain experts share demand data with ___ so there's no excess or shortage of stock.
Traders and suppliers
Q66. ___ mainly focuses on things that happen inside a company or trade.
Operations management
Q67. ___ is also known as Strategic Alliance or Collaborative Alliance.
Outsourcing strategy
Q68. ___ defines how products/services will be delivered to buyers or end-users.
Channel strategy
Q69. ___ can increase customer value of the product.
Supply chain management
Q70. Vendor rating is the process of rating the ___.
Supplier
Q71. A supplier rating system is also referred to as a ___ used to obtain an overall rating of supplier performance.
Score card system
Q72. VMI stands for ___.
Vendor Managed Inventory
Q73. ___ turn raw materials into finished goods and sell them in the market.
Manufacturers
Q74. ___ deals with products/services sold to Wholesalers and Retailers.
Business to Business (B2B)
Q75. RFI stands for ___.
Request for Information
Q76. Assigning a Performance Value for each requirement is part of ___.
Proposal Evaluation
Q77. Rating sheets with supplier record, product and evaluation factors are provided in ___.
The categorical plan
Q78. Factors are categorized and weight assigned to each based on vendor performance in ___.
Weighted point plan
Q79. The time a vendor takes to ship an order after receiving it (usually in days) is ___.
Supplier Lead Time
Q80. ___ is the task of buying goods of the right quality, in the right quantities, at the right time and at the right price.
Purchasing
Q81. Objectives of purchasing include ___.
Ensuring the best possible service and prompt delivery
Q82. Price structure, discounts and item availability help determine ___.
Right Quantity
Q83. 'Purchasing knows the price of everything and value of nothing' indicates the need for the ___ principle.
Right Attitude
Q84. Which is NOT a consideration in a make-or-buy decision?
Political and social factors
Q85. A ___ is a legal offer to purchase.
Purchase order
Q86. Procuring an item in staggering deliveries per an agreed schedule is called ___.
Scheduled buying
Q87. Buying the annual requirement of an item during its season is called ___.
Speculative buying
Q88. ___ sourcing is the use of more than one supplier for an item.
Multiple sourcing
Q89. The tender published in newspapers/trade journals for procuring desired-specification materials is called ___.
Open tender
◆ ◆ ◆
Unit IV

Inventory Control & Work / Time Study

Key Inventory Formulas

Reorder Point = Lead Time Demand + Safety Stock
Order cycle = time between two successive orders. Lead time = time between placing an order and receiving it. Carrying cost = expense of storing inventory over time.

ABC Analysis

CategoryMeaning
AHigh value, tight control
BAverage importance in value, moderate control
CLow value, loose control / bulk order

Method Study vs Time Study vs Work Sampling

TechniqueWhat it does
Method StudyRecords & critically examines existing/proposed work methods
Time StudyRecords & synthesises times to perform a motion/job
Work SamplingRandom observations to find relative frequency of activities
Symbol In work-study charts, O = Operation.

Unit IV — MCQ Flash Recall (30 Qs)

Q90. Which of the following is NOT an inventory: ___.
Material Management (a function, not a stock type)
Q91. Inventory consists of ___.
Tangible property
Q92. A company holding extra inventory against certain situations for a safety margin has ___.
Safety stock
Q93. Inventory held for sale in the ordinary course of business is ___.
Finished Goods
Q94. Effective inventory management minimizes investment in inventory by effectively meeting the ___.
Functional requirement
Q95. Factors that determine inventory levels include ___.
Item perishability and storage capacity
Q96. The manager of inventory would most likely be found in the ___.
Manufacturing Function
Q97. A system carrying only small inventories (a few days' worth) to reduce inventory-management cost is generally called ___ (note: source flags EOQ here, though this description matches JIT).
Just-In-Time (JIT) — source-labelled as EOQ, flagged inconsistent
Q98. Activities coordinating, controlling and planning the flow of inventory are classified as ___.
Inventory management
Q99. An advantage of holding inventory is ___.
Greater availability
Q100. In ABC Analysis, the B category stands for ___.
Average importance in value
Q101. A company stores ___ in distribution centers to be prepared for future customer demand.
Safety stock
Q102. A technique used for inventory control is ___.
ABC Analysis
Q103. The expense of storing inventory for a specified time is ___.
Carrying cost
Q104. Reorder point = ___ + safety stock.
Lead time demand
Q105. The time period between placing two successive orders is called the ___.
Order cycle
Q106. The time between ordering an item for replenishment and actually receiving it is the ___.
Lead time
Q107. The two components making up the EOQ equation include ___.
Annual usage (and ordering/carrying cost)
Q108. In the Purchasing Model with Shortages, cost function C(S*,Q*) can be expressed as a function of ___.
(S, D)
Q109. EOQ with Shortages transforms into EOQ with No Shortage when ___.
Shortage cost tends to be zero
Q110. ___ is the systematic recording and critical examination of existing/proposed ways of doing work to develop effective methods.
Method study
Q111. The ___ stage of method study involves gathering sufficient data as the basis of evaluation.
Record
Q112. ___ involves systematically recording, analysing and synthesising the times required to perform a motion.
Time study
Q113. Which is NOT a technique of work measurement: ___.
Amalgamation
Q114. ___ is the technique to establish the time for a qualified worker to carry out a specified job at a defined performance level.
Work measurement
Q115. The length of time needed to complete a job refers to ___.
Work measurement
Q116. A technique analysing work via several random observations to see the relative frequency of elemental activities is ___.
Work sampling
Q117. The objective of Time Study is to determine the time required to complete a job by an ___.
Average worker
Q118. Equipment NOT used for time study includes ___.
Thermometer
Q119. The symbol 'O' in work study represents ___.
Operation
◆ ◆ ◆
Unit V

Quality Management, SQC & Maintenance

4 Categories of Cost of Quality

CategoryMeaning
PreventionSpend to stop defects occurring
AppraisalSpend to detect defects (inspection, testing)
Internal FailureDefects found before reaching customer (scrap, rework)
External FailureDefects found after customer has it — most expensive

Control Charts — Quick Match

C-chart = number of defects per unit (discrete variable). P-chart = fraction/attribute defective. Control limits = dividing lines between random (common-cause) and non-random (assignable-cause) variation, typically ±3σ from the centre line.

Maintenance Types

TypeNature
PreventiveScheduled at fixed intervals
Predictive/Condition-basedMonitors condition (vibration, thermal)
BreakdownReactive — repair after failure
Failure curve Infant stage → decreasing failure rate. Wear-out (old-age) stage → increasing/wear-out failure. Group replacement suits items that fail completely & suddenly, not repairable items.

Unit V — MCQ Flash Recall (30 Qs)

Q120. The degree to which design specifications for a product/service are appropriate to its function/use, and conformance to those specs, defines ___.
Quality
Q121. Competitive advantage in the production function can be achieved through ___.
Higher quality
Q122. A system used to maintain a desired level of quality in a product/service is ___.
Quality control
Q123. Costs of all activities to prevent poor quality are called ___ costs.
Prevention
Q124. The cost of measuring, evaluating or auditing products/services to assure conformance is ___ cost.
Appraisal
Q125. Costs from products/services not conforming to requirements or user needs are ___ costs.
Failure
Q126. The 'bells and whistles' of products and services are called ___.
Features
Q127. ___ refers to the appearance — weight, colour, size, texture, packaging design.
Aesthetics
Q128. The odd one out (NOT a dimension of quality) is ___.
Reassurance
Q129. Verifying whether a product meets required specifications and client expectations is ___.
Quality control
Q130. The control chart applicable when quality is a discrete variable is the ___ chart.
C-chart
Q131. The control chart used for the number of defects per unit is the ___.
C-chart
Q132. The dividing lines between random and non-random deviations from the mean are known as ___.
Control limits
Q133. Process control is carried out ___.
During production
Q134. The chart used to monitor attributes (fraction defective) is the ___.
P-chart
Q135. A set of activities that keeps plant, machinery and facilities in good working condition is ___.
Maintenance
Q136. One objective of maintenance is ___.
To extend the useful life of plant & machinery
Q137. The combination of tasks required to keep a machine/part in a desirable condition is ___.
Maintenance
Q138. An objective of maintenance management is ___.
To reduce breakdown of machineries
Q139. The primary function of plant maintenance does NOT include ___.
Planning of machineries (as a standalone excluded item)
Q140. Decreasing failure rate is usually observed in the ___ stage of a machine's life.
Infant (early-life) stage
Q141. The type of failure that usually occurs in the old age of a machine is ___.
Wear-out failure
Q142. The production manager will NOT recommend group replacement policy in case of ___.
Repairable items
Q143. In retrogressive failures, the failure probability ___ with time.
Decreases
Q144. Replacement decisions are very common in this stage: ___.
Wear and Tear stage
Q145. Group replacement policy suits identical, low-cost items likely to ___.
Fail over a period of time
Q146. A machine is replaced when the average running cost ___.
Of the current period is less than that of the next period
Q147. Group replacement policy applies to items that ___.
Fail completely & suddenly
Q148. The replacement policy imposed on an item irrespective of its failure is ___.
Group replacement
Q149. The replacement model considered a probabilistic model is the ___.
Preventive maintenance policy (individual/group replacement under uncertainty)
◆ ◆ ◆
Full Bank

Complete MCQ Drill — All 149 Questions

Every question from all 15 weekly sets, in one shuffled-through list for a final speed round. Tap each card to reveal the answer.

Q1. Operations Management is a ___ process.
Transformation
Q2. ___ is the core function of an organization.
Operations
Q3. ___ is the principle: understanding the current state of operations enables informed decisions and effective improvement.
Reality
Q4. Holding individuals/teams responsible for their roles and performance, promoting ownership, refers to the ___ principle.
Accountability
Q5. Training employees forms part of the ___ objective of Operations Management.
Improving quality
Q6. Achieving Optimal Capacity Utilisation does NOT include ___.
Keeping promises
Q7. Operations Management deals with the production of ___.
Goods and services
Q8. ___ processes are central to the operations system.
Transformation
Q9. Forecasting, capacity planning, scheduling, managing inventories, quality assurance, motivating employees, facility location are all ___ functions.
Operations
Q10. The organizational function consisting of all activities directly related to producing a good or service is ___.
Operations
Q11. Production Planning and Control (PPC) is crucial for cost savings and efficiency in ___.
Production
Q12. The process of deciding the path material moves from start to finish is known as ___.
Routing
Q13. The PPC function related to the timetable of activities is ___.
Scheduling
Q14. The correct sequence of operations in PPC is ___.
Routing → Scheduling → Dispatching → Follow-up
Q15. The control activity in PPC is performed ___ of the plan.
After execution
Q16. ___ involves anticipating bottlenecks in advance and ensuring smooth flow of production.
Production planning
Q17. ___ is responsible for the order of processing each activity under PPC.
Sequencing
Q18. ___ is concerned with the time required to perform each activity under PPC.
Scheduling
Q19. In manufacturing, cost can be kept under control through ___ reduction.
Wastage
Q20. A ___ is a combination of tools and procedures used to turn raw materials into completed products.
Manufacturing system
Q21. The act of assessing the future and making provisions for it is known as ___.
Forecasting
Q22. Operations-generated forecasts often do NOT deal with ___.
Sales
Q23. Which is NOT true for forecasting: short-range forecasts are ___ than long-range forecasts.
Less accurate (incorrect — they are actually MORE accurate)
Q24. The time horizon selected for forecasting depends on the ___ for which the forecast is made.
Purpose
Q25. A medium-range forecasting period is approximately ___.
3 to 6 months
Q26. Long-range forecasting periods may be approximately ___.
Above 5 years
Q27. To plan for future manpower requirements, ___ forecasting is used.
Long-range
Q28. Long-range forecasting is useful in planning for ___.
Research and Development
Q29. Medium-range forecasting is useful to plan for ___.
Capacity adjustments
Q30. An important factor in forecasting production is the ___ of machines.
Available capacity
Q31. ___ is the capability of manufacturing to produce goods and services.
Capacity
Q32. Capacity planning primarily helps to ___.
Save time
Q33. Of the factors affecting Capacity Planning, the LESS controllable one is ___.
Machine break-downs
Q34. Effective capacity is NOT influenced by ___.
None of the above (all listed factors DO influence it)
Q35. The ability to rapidly shift production capacity between products/services is called ___.
Capacity flexibility
Q36. Capacity = ___.
(Maximum production rate/hour) × (Number of hours worked/period)
Q37. Theoretical capacity is what can be achieved under ideal conditions for a ___.
Short period of time
Q38. Operational capacity planning approaches to balance customer demand with production capability include ___.
All of the above
Q39. Low-capacity utilization is a signal of ___.
Industrial sickness
Q40. The maximum designed service capacity or output rate is called ___.
Design capacity
Q41. Banks, fast-food chains, supermarkets and retail stores view locations as ___.
A crucial part of the marketing strategy
Q42. In the Factor Rating Method, which is NOT a managerial choice?
All of the above require managerial decision (trick option)
Q43. Which is NOT a step in the general location-decision procedure?
Gain government approval of location alternatives
Q44. The location-analysis technique that views the problem in economic terms is ___.
Cost-Volume-Profit (location break-even) analysis
Q45. A dominant factor influencing a manufacturing firm's location decision is ___.
Transportation cost
Q46. For global expansion, decision makers must be clear on benefits/risks/likelihood when identifying ___.
A country
Q47. You would establish a composite value for ___.
Factor rating
Q48. Mining, farming, forestry and fishing locate near raw-material sources due to ___.
Necessity
Q49. The method for locating a distribution centre that minimises distribution costs is ___.
Location cost-profit-volume (or Centre-of-Gravity) analysis
Q50. The crossover chart in location break-even analysis shows where ___.
Total costs are equal for alternative locations
Q51. ___ is the process of selecting the path each part of the product will follow.
Routing
Q52. ___ is fixing the time/date for each operation and determining the operation sequence.
Scheduling
Q53. ___ is a time-table specifying when each operation is started and completed.
Schedule
Q54. ___ involves fixing the path through which work will flow for manufacturing goods.
Routing
Q55. ___ is a time-table for performing activities, utilising or allocating resources.
Scheduling
Q56. Routing and scheduling is most difficult in this manufacturing system: ___.
Job shop
Q57. The Gantt chart is mostly used for ___.
Scheduling
Q58. The Bill of Materials (BOM) does NOT consist of ___.
Price of the part
Q59. Procurement cycle time is the time consumed for ___.
All of the above (sourcing, ordering, receiving)
Q60. The typical manufacturing supply-chain sequence is ___.
Supplier – Storage – Manufacturing – Storage – Distributor – Retailer – Customer
Q61. A ___ encompasses all activities associated with the flow/transformation of goods from raw material to end user, plus information flows.
Supply chain
Q62. A supply chain is a network of facilities that procure raw materials and transform them into ___ goods.
Finished
Q63. Information management is a function of ___ in operations.
Supply chain management
Q64. The ___ process has huge implications for running key operations in almost every organization.
Supply Chain Management
Q65. Supply-chain experts share demand data with ___ so there's no excess or shortage of stock.
Traders and suppliers
Q66. ___ mainly focuses on things that happen inside a company or trade.
Operations management
Q67. ___ is also known as Strategic Alliance or Collaborative Alliance.
Outsourcing strategy
Q68. ___ defines how products/services will be delivered to buyers or end-users.
Channel strategy
Q69. ___ can increase customer value of the product.
Supply chain management
Q70. Vendor rating is the process of rating the ___.
Supplier
Q71. A supplier rating system is also referred to as a ___ used to obtain an overall rating of supplier performance.
Score card system
Q72. VMI stands for ___.
Vendor Managed Inventory
Q73. ___ turn raw materials into finished goods and sell them in the market.
Manufacturers
Q74. ___ deals with products/services sold to Wholesalers and Retailers.
Business to Business (B2B)
Q75. RFI stands for ___.
Request for Information
Q76. Assigning a Performance Value for each requirement is part of ___.
Proposal Evaluation
Q77. Rating sheets with supplier record, product and evaluation factors are provided in ___.
The categorical plan
Q78. Factors are categorized and weight assigned to each based on vendor performance in ___.
Weighted point plan
Q79. The time a vendor takes to ship an order after receiving it (usually in days) is ___.
Supplier Lead Time
Q80. ___ is the task of buying goods of the right quality, in the right quantities, at the right time and at the right price.
Purchasing
Q81. Objectives of purchasing include ___.
Ensuring the best possible service and prompt delivery
Q82. Price structure, discounts and item availability help determine ___.
Right Quantity
Q83. 'Purchasing knows the price of everything and value of nothing' indicates the need for the ___ principle.
Right Attitude
Q84. Which is NOT a consideration in a make-or-buy decision?
Political and social factors
Q85. A ___ is a legal offer to purchase.
Purchase order
Q86. Procuring an item in staggering deliveries per an agreed schedule is called ___.
Scheduled buying
Q87. Buying the annual requirement of an item during its season is called ___.
Speculative buying
Q88. ___ sourcing is the use of more than one supplier for an item.
Multiple sourcing
Q89. The tender published in newspapers/trade journals for procuring desired-specification materials is called ___.
Open tender
Q90. Which of the following is NOT an inventory: ___.
Material Management (a function, not a stock type)
Q91. Inventory consists of ___.
Tangible property
Q92. A company holding extra inventory against certain situations for a safety margin has ___.
Safety stock
Q93. Inventory held for sale in the ordinary course of business is ___.
Finished Goods
Q94. Effective inventory management minimizes investment in inventory by effectively meeting the ___.
Functional requirement
Q95. Factors that determine inventory levels include ___.
Item perishability and storage capacity
Q96. The manager of inventory would most likely be found in the ___.
Manufacturing Function
Q97. A system carrying only small inventories (a few days' worth) to reduce inventory-management cost is generally called ___ (note: source flags EOQ here, though this description matches JIT).
Just-In-Time (JIT) — source-labelled as EOQ, flagged inconsistent
Q98. Activities coordinating, controlling and planning the flow of inventory are classified as ___.
Inventory management
Q99. An advantage of holding inventory is ___.
Greater availability
Q100. In ABC Analysis, the B category stands for ___.
Average importance in value
Q101. A company stores ___ in distribution centers to be prepared for future customer demand.
Safety stock
Q102. A technique used for inventory control is ___.
ABC Analysis
Q103. The expense of storing inventory for a specified time is ___.
Carrying cost
Q104. Reorder point = ___ + safety stock.
Lead time demand
Q105. The time period between placing two successive orders is called the ___.
Order cycle
Q106. The time between ordering an item for replenishment and actually receiving it is the ___.
Lead time
Q107. The two components making up the EOQ equation include ___.
Annual usage (and ordering/carrying cost)
Q108. In the Purchasing Model with Shortages, cost function C(S*,Q*) can be expressed as a function of ___.
(S, D)
Q109. EOQ with Shortages transforms into EOQ with No Shortage when ___.
Shortage cost tends to be zero
Q110. ___ is the systematic recording and critical examination of existing/proposed ways of doing work to develop effective methods.
Method study
Q111. The ___ stage of method study involves gathering sufficient data as the basis of evaluation.
Record
Q112. ___ involves systematically recording, analysing and synthesising the times required to perform a motion.
Time study
Q113. Which is NOT a technique of work measurement: ___.
Amalgamation
Q114. ___ is the technique to establish the time for a qualified worker to carry out a specified job at a defined performance level.
Work measurement
Q115. The length of time needed to complete a job refers to ___.
Work measurement
Q116. A technique analysing work via several random observations to see the relative frequency of elemental activities is ___.
Work sampling
Q117. The objective of Time Study is to determine the time required to complete a job by an ___.
Average worker
Q118. Equipment NOT used for time study includes ___.
Thermometer
Q119. The symbol 'O' in work study represents ___.
Operation
Q120. The degree to which design specifications for a product/service are appropriate to its function/use, and conformance to those specs, defines ___.
Quality
Q121. Competitive advantage in the production function can be achieved through ___.
Higher quality
Q122. A system used to maintain a desired level of quality in a product/service is ___.
Quality control
Q123. Costs of all activities to prevent poor quality are called ___ costs.
Prevention
Q124. The cost of measuring, evaluating or auditing products/services to assure conformance is ___ cost.
Appraisal
Q125. Costs from products/services not conforming to requirements or user needs are ___ costs.
Failure
Q126. The 'bells and whistles' of products and services are called ___.
Features
Q127. ___ refers to the appearance — weight, colour, size, texture, packaging design.
Aesthetics
Q128. The odd one out (NOT a dimension of quality) is ___.
Reassurance
Q129. Verifying whether a product meets required specifications and client expectations is ___.
Quality control
Q130. The control chart applicable when quality is a discrete variable is the ___ chart.
C-chart
Q131. The control chart used for the number of defects per unit is the ___.
C-chart
Q132. The dividing lines between random and non-random deviations from the mean are known as ___.
Control limits
Q133. Process control is carried out ___.
During production
Q134. The chart used to monitor attributes (fraction defective) is the ___.
P-chart
Q135. A set of activities that keeps plant, machinery and facilities in good working condition is ___.
Maintenance
Q136. One objective of maintenance is ___.
To extend the useful life of plant & machinery
Q137. The combination of tasks required to keep a machine/part in a desirable condition is ___.
Maintenance
Q138. An objective of maintenance management is ___.
To reduce breakdown of machineries
Q139. The primary function of plant maintenance does NOT include ___.
Planning of machineries (as a standalone excluded item)
Q140. Decreasing failure rate is usually observed in the ___ stage of a machine's life.
Infant (early-life) stage
Q141. The type of failure that usually occurs in the old age of a machine is ___.
Wear-out failure
Q142. The production manager will NOT recommend group replacement policy in case of ___.
Repairable items
Q143. In retrogressive failures, the failure probability ___ with time.
Decreases
Q144. Replacement decisions are very common in this stage: ___.
Wear and Tear stage
Q145. Group replacement policy suits identical, low-cost items likely to ___.
Fail over a period of time
Q146. A machine is replaced when the average running cost ___.
Of the current period is less than that of the next period
Q147. Group replacement policy applies to items that ___.
Fail completely & suddenly
Q148. The replacement policy imposed on an item irrespective of its failure is ___.
Group replacement
Q149. The replacement model considered a probabilistic model is the ___.
Preventive maintenance policy (individual/group replacement under uncertainty)