MBA Semester I · V20PBA104

Operations Management
Exam Prep Guide

Every unique Part B (5-mark) and Part C (10/20-mark) question consolidated from the ONLINE_JULY23, DEC_2023_OLE and Set-005391 exam papers, the unit-wise question bank and FAQ notes — ranked by how often each concept was repeated, with every numerical fully worked.

20Part B Questions
13Part C Questions
5Units Covered
B1 Operations Management — Meaning, Scope, Objectives & the I-T-O Model 5 marks
Asked in: Repeated in 5 of 7 source papers/question-banks Highest priority
Operations Management (OM) is the branch of management concerned with designing, operating and controlling the systems that convert inputs — men, materials, money, machines and information — into outputs of goods and services, at the desired quality, cost and time. Buffa defines OM as decision-making related to production processes so that goods/services are produced to specification, in the amount and by the schedule demanded, at minimum cost. Scope covers: design of products/services/processes, facility location & layout planning, capacity planning & operations strategy, planning & control of production/inventory/materials (PPC, MRP), quality management, maintenance management and asset replacement, and supply-chain & purchase management. Objectives: minimise operating costs (waste reduction, efficient processes, supplier negotiation), achieve optimal capacity utilisation (scheduling, inventory control), improve quality (QC/QA systems), maximise customer satisfaction (timely, reliable delivery). Importance: OM ensures smooth day-to-day functioning, links customer-facing and back-office functions, drives cost efficiency and competitiveness, and underlies project planning, supply-chain performance and ultimately profitability and growth.
B2 Factors Affecting Location Decisions + Weighted Factor-Rating Method 5 marks
Asked in: Repeated in 6 of 7 sources
A location decision is long-term and capital-intensive, evaluated against quantitative and qualitative factors: availability & cost of raw materials, nearness to market/customers, availability/cost/skill of labour, transportation facilities, availability of power/fuel/water, government policies/taxation/incentives, climate/community attitude/quality of life, and site factors (land cost, topology, effluent disposal). Weighted Factor-Rating Method — Worked Example:
FactorWeightLoc. ALoc. BLoc. C
Easy access0.15867290
Parking facilities0.20727791
Display area0.18869090
Shopper traffic0.21948680
Neighborhood wealth0.16998981
Neighborhood safety0.10968575
Weighted Composite Score—87.9683.2085.16
Each score = Σ(rating × weight). Since Location A has the highest composite score (87.96), it should be selected.
B3 Make-or-Buy Decision — Factors & Worked Numerical Example 5 marks
Asked in: Repeated in 5 of 7 sources
A Make-or-Buy (outsourcing) decision compares cost, quality and control implications of manufacturing in-house vs purchasing externally. Factors favouring BUY: lack of in-house expertise/technology, insufficient capacity for a demand spike, lower total cost from a specialised vendor, low volume that doesn't justify investment, opportunity to learn from supplier. Factors favouring MAKE: idle capacity, high buying price, need for secrecy/quality control, strategic importance of the component. Worked Example: Buying price = ₹4.5/unit; in-house Fixed Cost = ₹18,000; Variable Cost = ₹2.2/unit; Demand = 8,000 units/year.
BasisFormulaValue
Cost of BuyingPrice × Demand4.5 × 8,000 = ₹36,000
Cost of MakingFC + (VC × Demand)18,000 + (2.2 × 8,000) = ₹35,600
DecisionLower cost winsMake in-house (₹35,600 < ₹36,000)
Since the cost of making is marginally lower, the company should manufacture in-house — though the tiny margin means the decision should be reviewed if demand/costs fluctuate.
B4 Capacity Planning — Meaning, Benefits & Strategies 5 marks
Asked in: Repeated in 5 of 7 sources
Capacity planning is the process of determining the production capacity an organisation needs to meet changing demand — deciding how much, when and where to add capacity. Benefits: helps meet future demand without stock-outs, avoids cost of idle/over-capacity, identifies bottlenecks early, supports competitiveness via faster delivery, and eases overall management by matching resources to workload. Types/Strategies: Lead Strategy — capacity added in anticipation of demand growth (aggressive; risk of idle capacity). Lag Strategy — capacity added only after demand has actually risen (conservative; risk of lost sales). Match Strategy — capacity added in small increments in line with demand changes (balanced). Also: Resource, Project, Team and HR Capacity Planning — sub-types based on what is being planned (machine hours, project workload, team bandwidth, or headcount).
B5 Forecasting — Concept, 5-Step Process & Moving Average Method 5 marks
Asked in: Repeated in 5 of 7 sources
Forecasting is the act of assessing the future and making provisions for it — using past data, trends and expert judgement to estimate future demand so production, capacity and inventory can be planned proactively. 5-Step Forecasting Process: (1) Understand the purpose of the forecast, (2) Select items/time-horizon to forecast, (3) Choose an appropriate model (qualitative, time-series, or associative), (4) Gather data & develop the forecast, (5) Monitor actual results & refine the model. Worked Example — Moving Average Forecast:
Year2010201120122013
Sales (₹ lakh)789591112
Using a 4-year moving average, Forecast for 2014 = (78+95+91+112)/4 = 376/4 = 94 (₹ lakh). The moving average smooths short-term fluctuations but reacts slowly to a genuine demand shift — a limitation addressed by weighted moving average or exponential smoothing, which weight recent data more heavily.
B6 Inventory — Concept, Benefits, Challenges & Types 5 marks
Asked in: Repeated in 4 of 7 sources
Inventory is a physical resource held in stock, either for sale or for use in producing a more valuable output — raw materials, WIP, or finished goods. Types: Raw Materials (inputs awaiting processing), Work-in-Progress/WIP (partially completed goods), Finished Goods (ready for sale), MRO Inventory (maintenance/repair/operating supplies), Buffer/Safety Stock (cushion against uncertainty). Benefits: prevents stock-outs/lost sales, stabilises production against demand fluctuation, allows bulk-purchase discounts, hedges against price inflation, improves customer satisfaction via availability. Challenges: high carrying cost (storage, insurance, obsolescence), risk of damage/pilferage, capital lock-up, difficulty forecasting demand accurately.
B7 Time Study — Normal Time & Standard Time Calculation 5 marks
Asked in: Repeated in 6 of 7 sources
A job is sub-divided into elements; each element has an Observed Time (OT) and Rating Factor (RF). Normal Time (NT) = Σ(OT × RF).
ElementObserved Time (min)Rating Factor (%)Normal Time = OT × RF
10.7800.56
20.81000.80
31.31201.56
40.5900.45
51.21001.20
Total——4.57 min
Standard Time (ST) = Normal Time + Allowances = NT × (1 + Allowance %) = 4.57 × 1.15 = 5.26 minutes (at 15% allowance). Normal Time reflects the time a qualified worker takes at 100% rating; allowances are then added for personal needs, fatigue and unavoidable delays to reach the Standard Time used for wage-incentive and planning purposes.
B8 Economic Order Quantity (EOQ) — Concept, Formula & Numerical 5 marks
Asked in: Repeated in 4 of 7 sources
EOQ is the order quantity that minimises total inventory cost — the sum of ordering cost (falls as order size rises) and carrying cost (rises as order size rises).
Q* = √(2DS / H)
where D = annual demand, S = ordering cost per order, H = carrying cost per unit per year. Worked Example: D = 48,000 units/year, S = ₹9/order, carrying cost = 15% of unit cost ₹4 = ₹0.60/unit/year.
StepCalculationResult
EOQ√(2×48,000×9 / 0.60)1,200 units
No. of orders/yearD / EOQ48,000/1,200 = 40 orders
Order cycle time360 days / 409 days
B9 Five Core Functions of Supply Chain Management (SCM) 5 marks
Asked in: Repeated in 4 of 7 sources
SCM coordinates the flow of materials, information and finances from supplier → manufacturer → wholesaler → retailer → consumer. Its 5 core functions: Planning — forecasting demand and aligning supply-chain resources. Sourcing — selecting suppliers, negotiating price/quality/delivery terms. Making (Production) — converting raw materials into finished goods efficiently. Delivering (Logistics) — warehousing, transportation, order fulfilment. Returning — handling defective/excess/end-of-life returns (reverse logistics). Together these ensure the right product reaches the right place, at the right time, at lowest total cost — SCM's goal is to integrate supply and demand across the entire network, not just within one firm (unlike OM, which is largely intra-organisational).
B10 Vertical vs Horizontal Integration in SCM 5 marks
Asked in: Repeated in 3 of 7 sources
BasisVertical IntegrationHorizontal Integration
MeaningFirm acquires/controls stages of its own supply chain (suppliers/distributors)Firm acquires/merges with a competitor at the same stage
DirectionBackward (own suppliers) or Forward (own distribution/retail)Sideways — same level of the value chain
ObjectiveGreater control over cost, quality, supply reliabilityGreater market share, economies of scale, reduced competition
ExampleTesla manufacturing its own batteries (backward)Facebook acquiring Instagram (horizontal)

Backward vertical integration gives control over raw-material cost/quality (e.g., Apple designing its own chips); forward vertical integration gives control over customer experience (e.g., Tesla's own showrooms). Horizontal integration grows scale at the same chain stage but attracts anti-trust scrutiny.

B11 Vendor Rating — Meaning, Process & QDP Method 5 marks
Asked in: Repeated in 4 of 7 sources
Vendor rating is a systematic evaluation of a supplier's performance against agreed criteria — typically Quality, Delivery and Price (QDP) — to guide vendor selection, cost control and continuous supplier improvement. QDP Rating Method: Quality Rating = (Qty Accepted / Qty Supplied) × Weight for Quality. Delivery Rating = (Qty Received on time / Qty ordered as per PO) × Weight for Delivery. Price Rating = (Lowest quoted price / Vendor's quoted price) × Weight for Price. The three weighted scores are summed for a composite score per vendor; the highest-scoring vendor is selected. This process helps control cost (best-value vendors), manage risk (flags unreliable suppliers), and drives continuous improvement through structured feedback and periodic re-evaluation. (A fully worked 3-vendor QDP numerical appears in Part C Q1(b).)
B12 Centralized vs Decentralized Stores 5 marks
Asked in: Repeated in 3 of 7 sources
Centralized StoreDecentralized Store
AdvantagesEasy to manage, more economical, less space, consistent supply, fewer staff neededFast fulfilment of departmental needs, zero internal transport cost, suitable for large-volume movement
DisadvantagesDelay supplying distant departments, higher internal transport cost, risk of production stoppage if store failsHigher capital requirement, more space and staff needed, greater risk of fraud/pilferage across multiple stores
B13 Selective Inventory Control — ABC & VED Analysis 5 marks
Asked in: Repeated in 3 of 7 sources
Selective inventory control recognises that not every item deserves the same control effort, and classifies items so management attention concentrates on the most critical/valuable ones. ABC Analysis classifies items by annual consumption value: A items — ~10-20% of items, ~70-80% of value → tight control, frequent review. B items — ~20-30% of items, ~15-25% of value → moderate control. C items — ~50-60% of items, ~5-10% of value → loose control, bulk ordering. VED Analysis classifies items by criticality to operations: Vital (stock-out halts production — must never run out), Essential (important but brief shortage tolerable), Desirable (nice to have, no serious impact if unavailable). VED is typically combined with ABC (e.g., hospitals use it for life-saving medicines vs general supplies) to prioritise both value and operational risk simultaneously.
B14 Material Requirement Planning (MRP-I) — Inputs, Outputs & Role 5 marks
Asked in: Repeated in 3 of 7 sources
MRP-I is a computerised, push-based system that calculates the exact quantity and timing of materials/components needed to meet the Master Production Schedule (MPS), so production is neither starved of materials nor burdened with excess inventory. Inputs: Master Production Schedule (MPS — what final products are needed and when), Bill of Materials (BOM — complete parts/components list per product), Inventory Status/Records File (on-hand stock + quantities already on order). Outputs: Planned Order Schedules and Order Releases, Changes to planned orders (cancellations/re-schedules), Exception reports (late orders, shortages) and performance-control reports. Role: MRP integrates inventory management, purchasing and shop-floor scheduling into one logic, ensuring dependent-demand items (components) are procured/produced only when actually required — reducing stock-outs and excess WIP. MRP-II extends this to plan all manufacturing resources (labour, machine capacity, finance), not materials alone.
B15 7R Principles of Purchase Management + Purchasing Methods 5 marks
Asked in: Repeated in 3 of 7 sources
The 7R Principles define purchasing's core objective — procuring: Right Quality, Right Quantity, Right Price, Right Time, Right Source (Vendor), Right Place, Right Attitude/Relationship with the supplier. Major Purchasing Methods: Speculative Purchasing — buying in bulk when prices are low for future use; risky in a volatile market but locks in low cost. Hand-to-Mouth (Zero-Stock/JIT) Buying — ordering only for immediate need; minimises carrying cost but raises stock-out risk. Blanket Purchasing — a single long-term contract covering repeated deliveries. Tender Buying (Open/Limited/Global) — competitive bids for large-value items. Scheduled Buying — ordering per a pre-agreed delivery schedule linked to production needs.
B16 Plant Layout — Objectives, Importance & Types 5 marks
Asked in: Repeated in 3 of 7 sources
Plant layout is the arrangement of machines, equipment and work-areas within a factory to achieve the smoothest flow of material at the lowest cost with minimum handling. Objectives: minimise material-handling and production cycle time, ensure worker safety/comfort, maximise space utilisation, provide flexibility for future expansion, support smooth supervision/control. Types of Layout: Process (Functional) Layout — similar machines grouped together; suits low-volume, high-variety (job-shop) production. Product (Line) Layout — machines arranged in operation sequence; suits high-volume, standardised mass production. Fixed-Position Layout — product stays stationary, resources brought to it (shipbuilding, construction). Cellular Layout — machines grouped into self-contained 'cells' each producing a family of parts; combines flexibility with line-like efficiency.
B17 Seven Basic/Traditional Tools of Quality Control 5 marks
Asked in: Repeated in 3 of 7 sources
The Seven Basic QC Tools are simple, graphical tools used to analyse and improve process quality: Cause-and-Effect (Fishbone/Ishikawa) Diagram — identifies root causes of a defect. Check Sheet — structured form for recording defect occurrence data. Control Chart — plots process data over time against UCL/LCL to detect abnormal variation. Histogram — bar chart showing frequency distribution of a quality characteristic. Pareto Chart — ranks defect causes by frequency to focus on the 'vital few'. Scatter Diagram — shows correlation between two variables (e.g., temperature vs defect rate). Flow Chart / Stratification — maps process flow or segments data by source to locate where problems arise. Applied together, these let a quality team move from broad symptom (Pareto chart) → root cause (fishbone) → statistically verified control (control charts) — the backbone of Statistical Quality Control (SQC).
B18 Four Categories of Cost of Quality (CoQ) 5 marks
Asked in: Repeated in 3 of 7 sources
CategoryDescriptionExamples
Prevention CostSpending to keep defects from occurring at allQuality planning, employee training, supplier certification
Appraisal CostSpending to detect defects before they reach the customerInspection, testing, quality audits, SPC
Internal Failure CostCost of defects found before the product reaches the customerScrap, rework, machine breakdown, labour errors
External Failure CostCost of defects found after the customer has the product (most expensive)Returns/recalls, warranty claims, lost reputation

As prevention spending rises, appraisal and failure costs fall sharply — organisations aiming for lower total CoQ invest proactively in prevention rather than relying on inspection to catch defects after the fact.

B19 Types of Preventive/Plant Maintenance 5 marks
Asked in: Repeated in 4 of 7 sources
Plant maintenance keeps equipment operating reliably by repairing, replacing or servicing components as normal wear-and-tear occurs. Planned Maintenance — scheduled proactively: Preventive (fixed intervals, e.g. periodic lubrication/inspection), Predictive/Condition-Based (vibration analysis, thermography to catch early failure signs), Routine (repetitive cleaning/small adjustments). Unplanned Maintenance — reactive: Breakdown (repair only after failure), Emergency (urgent repair to restore safe/efficient operation fast). Total Productive Maintenance (TPM) combines these approaches with operator involvement to minimise failures and their costs, aiming for zero breakdowns and zero defects.
B20 Quality — Definition & Garvin's Eight Dimensions of Quality 5 marks
Asked in: Repeated in 3 of 7 sources
Quality is 'fitness for use' (Juran) or 'conformance to requirements' (Crosby) — the degree to which a product/service's characteristics fulfil stated or implied needs (ISO 9000). David Garvin's Eight Dimensions of Quality:
#DimensionMeaning
1PerformancePrimary operating characteristics of the product
2FeaturesSecondary characteristics — the 'bells and whistles'
3ReliabilityProbability of operating properly over a specified period
4ConformanceMatch between the product and pre-established standards
5DurabilityAmount of use obtained before deterioration/replacement
6ServiceabilitySpeed, courtesy and competence of repair
7AestheticsHow the product looks, feels, sounds, tastes or smells
8Perceived QualityReputation-based, indirect quality judgement by the customer
C1 (a) Plant Layout — Meaning & Top 10 Design Factors | (b) QDP Vendor Evaluation (Worked) 10 marks
Asked in: Repeated in 3 of 7 sources
(a) Meaning of Plant Layout
Plant layout is 'a technique of locating different machines and plant services within the factory so that the greatest possible output of high quality at the lowest possible total cost can be achieved.' It covers arrangement of machines, work-areas, material-handling equipment, storage and transport paths — and, once installed, should still allow reasonably quick, low-cost change if expansion or a new product design later demands it. Top 10 Factors Influencing Plant Layout Design: 1. Nature of the Product — small/light products favour line layout; heavy/bulky favour fixed-position; wide variety favours process layout. 2. Production Volume — high-volume standardised → line/product layout; low-volume order-based → functional/process layout. 3. Location of the Site — plot topology/size constrains layout; positions of stairways, lifts, parking, storage shape the arrangement. 4. Type of Machines — heavy, noisy machines fixed to floor with adequate spacing for safety/vibration control. 5. Climate — temperature, ventilation, lighting designed in for worker health/comfort. 6. Service Facilities — rest rooms, drinking water, washrooms integrated so workers move freely. 7. Safety of Employees — obstruction-free, non-slippery floors, protection from fumes/heat/hazards. 8. Type of Production — job-order (non-standard) → functional layout; mass production → line layout. 9. Type of Process — intermittent processes (electronics assembly) → functional layout; continuous processes (cement, autos) → line layout. 10. Management Policy — product range, quality level, scale, planned expansion steer the layout choice. A well-designed layout shows minimum material handling/backtracking, straight material-flow, adaptability, proper service-facility placement, and control of noise/dust/temperature; a poor one shows overloaded machines next to idle ones, bottlenecks, excess temporary storage and frequent worker fatigue.
(b) QDP Vendor Evaluation — Worked Numerical
Given: Weightage — Quality = 60%, Delivery = 25%, Price = 15%.
Service DetailsCompany XCompany YCompany Z
Total quantity supplied9010070
Total quantity accepted809060
Unit price of item (₹)13.5013.0014.50
Delivery received as per PO708080
Step 1 — Quality Score = (Accepted/Supplied) × 60:
VendorCalculationQuality Score
X(80/90)×6053.33
Y(90/100)×6054.00
Z(60/70)×6051.43
Step 2 — Delivery Score = (On-time/Supplied) × 25:
VendorCalculationDelivery Score
X(70/90)×2519.44
Y(80/100)×2520.00
Z(80/70)×25 (capped at 100%)25.00
Step 3 — Price Score = (Lowest price/Vendor's price) × 15:
VendorCalculationPrice Score
X(13.00/13.50)×1514.44
Y(13.00/13.00)×1515.00
Z(13.00/14.50)×1513.45
Step 4 — Composite QDP Score:
VendorQualityDeliveryPriceTotal Score
X53.3319.4414.4487.21
Y54.0020.0015.0089.00
Z51.4325.0013.4589.88
Interpretation: Company Z scores marginally highest overall (89.88), driven mainly by perfect delivery — but Company Y offers the best balance of quality + lowest price + strong delivery. A gap under 1 point is within normal measurement error, so management should also weigh qualitative factors (financial stability, relationship history) before finalising.
C2 (a) Importance & Types of Maintenance Management | (b) Product-Mix Drop/Add Decision (Worked) 10 marks
Asked in: Repeated in 4 of 7 sources
(a) Importance of Maintenance Management
Maintenance ensures plant/machinery continue operating at designed efficiency. Importance: Continuity of production (breakdowns halt output, delay delivery), Cost control (proactive maintenance costs far less than emergency repair), Asset life extension (postpones costly replacement capex), Safety (worn equipment is a major accident cause), Quality (out-of-tolerance machines produce defects), Resale value (well-maintained assets retain higher value). Types of Maintenance: 1. Planned (Proactive): Preventive (fixed intervals), Predictive/Condition-Based (vibration/thermal monitoring), Routine (cleaning, small adjustments), Shutdown (major overhauls during full stoppage). 2. Unplanned (Reactive): Breakdown (repair after failure), Emergency (urgent restore-to-safe repair). 3. Corrective & Improvement: Corrective (restore failed unit), Improvement/Design-Out (redesign to eliminate the root cause). TPM (Total Productive Maintenance) integrates all approaches with operator involvement, targeting zero breakdowns, zero defects, zero accidents — maintenance as a strategic contributor to Overall Equipment Effectiveness (OEE), not merely a repair function.
(b) Product-Mix Decision — Drop A, Introduce D (Worked)
Fixed Cost/year = ₹7,500. Before: Total Sales = ₹25,000.
ProductPrice (₹)Variable Cost (₹)% of Sales Units
A10620
B6430
C201250
After (assumed sales ₹26,000):
ProductPrice (₹)Variable Cost (₹)% of Sales Units
D10610
B6450
C201240
Step 1 — Contribution Margin Ratio (CMR) = (Price − VC)/Price:
ProductP − VCCMR
A10-6=40.40
B6-4=20.333
C20-12=80.40
D10-6=40.40
Step 2 — Weighted CMR (before) = (0.40×0.20)+(0.333×0.30)+(0.40×0.50) = 0.380 Step 3 — Weighted CMR (after) = (0.40×0.10)+(0.333×0.50)+(0.40×0.40) = 0.3665
ScenarioSales (₹)Weighted CMRContribution (₹)Fixed Cost (₹)Profit (₹)
Before (A,B,C)25,0000.3809,5007,5002,000
After (D,B,C)26,0000.36659,5297,5002,029
Conclusion: Dropping A and introducing D marginally raises annual profit (₹2,000 → ₹2,029, +₹29). The decision is profitable, though only marginally — weigh this thin margin against strategic/customer-relationship factors and D's launch execution risk.
C3 (a) Manufacturing Systems — Types & Comparison | (b) Quality Definition & Dimensions + SERVQUAL 10 marks
Asked in: (a) 2 of 7 · (b) part of 3 of 7 sources
(a) Types of Manufacturing Systems
A manufacturing system is how production resources (machines, labour, materials) are organised to convert inputs to outputs — choice depends on the trade-off between volume and variety.
SystemDescriptionAdvantagesDisadvantagesTypical Application
Job (Project) ProductionOne-off/unique item made start-to-finish for a specific customerHigh customisation, quality attentionHigh unit cost, long cycle, hard to planCustom furniture, ships, bespoke tailoring
Batch ProductionLimited quantity of identical items produced together, then changeoverMore efficient than job, some economies of scale, flexible mixIdle time during changeover, WIP builds upBakery items, pharma, printed textiles
Mass/Line/Flow ProductionContinuous, standardised production along a fixed sequenceLow unit cost, high output, consistent qualityInflexible, high capital, monotonous work, line-wide stoppage riskAutomobile assembly, consumer electronics
Continuous/Process ProductionUninterrupted flow of a homogeneous product 24×7Max efficiency for single product, low labour cost/unitAlmost zero flexibility, huge fixed investment, costly shutdownOil refining, cement, chemicals, steel
Cell ProductionModern adaptation: production delegated to self-contained teams/cellsFlexibility of job + line-like efficiency, better worker motivationNeeds cross-trained workers, complex to planLean manufacturing, electronics sub-assembly
As volume rises and variety falls, organisations move progressively Job → Batch → Line/Mass → Continuous, trading flexibility for efficiency. Cell production is a hybrid recapturing flexibility without losing all line-layout efficiency gains, popular under Lean/JIT.
(b) Quality Definition & Dimensions
Quality = 'fitness for use' (Juran) / 'conformance to requirements' (Crosby) / 'degree to which inherent characteristics fulfil requirements' (ISO 9000). In operations terms: the degree to which design specifications are appropriate to function/use, and the degree to which delivery conforms to those specifications. Garvin's 8 Dimensions (products): Performance, Features, Reliability, Conformance, Durability, Serviceability, Aesthetics, Perceived Quality. SERVQUAL Dimensions (services, since services are intangible/simultaneous/heterogeneous): Reliability (consistent, dependable performance), Responsiveness (willingness/speed to help), Assurance (competence, courtesy, trust), Empathy (caring, individualised attention), Tangibles (physical facilities/equipment/appearance). Together Garvin + SERVQUAL give managers a structured way to define quality for their offering, set measurable targets, and decide where to invest improvement effort.
C4 Location Decisions — Importance, Factors & Techniques (Worked Factor Rating) 10 marks
Asked in: Repeated in 4 of 7 sources
Importance: A facility-location decision is strategic, long-term and capital-intensive — expensive/disruptive to reverse. It permanently shapes cost structure (transport, labour, taxes), speed of customer service, and competitive position. A poor decision locks in high costs/poor access for decades; a good one becomes a lasting competitive advantage. Factors — Manufacturing: raw-material availability/cost, nearness to market, labour availability/skill/cost, transport facilities, power/fuel/water availability, government policy, climate/site topology. Factors — Services: customer accessibility/footfall, visibility/parking, community attitudes/zoning/labour quality, competitor proximity (cluster effect or rivalry). Techniques of Location Analysis:
TechniqueHow it WorksBest Suited For
Factor Rating MethodWeights each factor, scores each location, sums weighted scoresCombining quantitative + qualitative factors, e.g. retail-site selection
Locational Break-Even (Cost-Volume) AnalysisPlots total cost lines per location; lowest total cost at expected volume winsComparing purely cost-based alternatives at known output
Centre-of-Gravity MethodFinds coordinates minimising total weighted transport distance/costSelecting a single distribution centre for multiple markets
Transportation Method (LP)Solves least-cost shipment pattern given capacity/demand constraintsChoosing among multiple sites feeding multiple destinations
Worked Illustration — Factor Rating Method:
FactorWeightLoc. ALoc. BLoc. C
Transportation0.4879
Labor Availability0.3987
Utilities0.2798
Community Facilities0.1867
Weighted Score—8.27.67.9
Composite score for A = (8×0.4)+(9×0.3)+(7×0.2)+(8×0.1) = 3.2+2.7+1.4+0.8 = 8.2. Location A wins (vs B=7.6, C=7.9). Unlike purely cost-based methods, Factor Rating can incorporate soft qualitative factors alongside hard quantitative ones in one transparent score.
C5 Forecasting — Concept, Importance & Major Techniques (full) 10 marks
Asked in: Repeated in 3 of 7 sources
Forecasting is assessing the future and making provisions for it, using historical data, current information and judgement. Since capacity planning, inventory policy, workforce scheduling and budgeting all depend on demand estimates, forecasting is the starting point of the entire planning hierarchy — a poor forecast cascades into stock-outs or excess inventory, directly hitting profitability. A. Qualitative (Judgemental) Methods — used when historical data is unavailable or for long-range strategic forecasts: Executive Judgement (Top-Down), Sales-Force Composite (Bottom-Up), Delphi Method (iterative anonymous expert rounds), Market Surveys. B. Time-Series (Quantitative) Methods — project historical patterns forward: Naive Method (next period = last actual), Simple Moving Average, Weighted Moving Average (recent periods weighted more), Exponential Smoothing (weighted avg with smoothing constant α). C. Associative (Causal) Methods — Regression Analysis: models demand as a function of a related variable (advertising spend, price). Time Horizons:
HorizonTypical SpanUsed For
Short-rangeUp to 3 monthsScheduling, hiring, production-level decisions
Medium-range3 months – 1 yearBudgeting, sales & demand planning
Long-range3+ yearsCapital expenditure, plant relocation/expansion, R&D
Best Practice: keep the model as simple as required accuracy allows; prefer aggregated forecasts (anomalies smooth out over larger datasets); every forecast carries margin of error; recalibrate regularly as new data arrives — forecasting is continuous, not one-time.
C6 Operations Strategy — Concept, Key Elements & Link to Business Strategy 10 marks
Asked in: Repeated in 2 of 7 sources
Operations strategy is the overall pattern of decisions shaping the long-term capabilities of the operations function and its contribution to overall business strategy — translating corporate goals into decisions on facility location, process design, technology and production/service organisation, decisions that are difficult/costly to reverse. Key Elements: Product Design, Product Assembly/Process Design, Packaging & Shipping, Supply Chain Optimisation, Resource Scheduling, Quality Control, Forecasting. Link to Business Strategy: business strategy defines where/how a firm competes (cost leadership, differentiation, focus); operations strategy must align to deliver on the chosen competitive priority:
Competitive PriorityOperations Decisions Typically Emphasised
CostStandardised product/line layout, high-volume automation, tight capacity utilisation, offshoring/outsourcing to low-cost locations
QualityRigorous SQC, TQM culture, supplier quality certification, redundant inspection
Speed/DeliveryLean/JIT flow, buffer stock at bottlenecks, agile/flexible scheduling
FlexibilityCellular/modular production, cross-trained workforce, flexible automation
Example: Toyota's reliable, affordable-vehicle strategy is supported by Lean/JIT production, TQM and long-term supplier partnerships. Zara competing on speed builds agile, small-batch production with rapid replenishment rather than least-cost mass manufacturing. Where operations strategy misaligns with business strategy (e.g. competing on cost while running customised, low-volume production), the cost structure fights the market position, undermining competitiveness.
C7 Sequencing — Objectives, Rules & Worked SPT Example 10 marks
Asked in: Repeated in 2 of 7 sources
Objectives: Sequencing decides the order jobs are processed on a machine/work centre — to minimise total completion (flow) time, minimise machine idle time, minimise average job lateness/tardiness, and maximise resource utilisation. With fixed jobs and fixed capacity, sequence order alone can substantially change throughput, WIP and on-time delivery, without any added capacity investment. Common Sequencing Rules:
RuleFull Form / LogicEffect
FCFSFirst-Come-First-Served — arrival orderSimple, perceived fair, not efficiency-optimal
SPTShortest Processing Time firstMinimises average/mean flow time & avg jobs in system
LPTLongest Processing Time firstRarely optimal; sometimes prevents long jobs being perpetually delayed
EDDEarliest Due Date firstMinimises maximum lateness across all jobs
Critical Ratio(Time remaining to due date)/(Work time remaining)CR<1 signals a job is behind schedule, needs priority
Worked Example — SPT for 5 Jobs on a Single Machine:
Job12345
Processing Time (hrs)3048703816
Step 1 — Arrange ascending by processing time (SPT sequence): Job5(16) → Job1(30) → Job4(38) → Job2(48) → Job3(70).
Sequence PositionJobProcessing TimeFlow Time (Cumulative)
1Job 51616
2Job 13046
3Job 43884
4Job 248132
5Job 370202
Step 2 — Mean Flow Time = Total Flow Time / Number of Jobs = (16+46+84+132+202)/5 = 480/5 = 96 hours. Conclusion: SPT yields the mathematically minimum mean flow time (96 hrs) for this job set — better than FCFS in original order 1-2-3-4-5, showing sequencing rule choice is itself an efficiency lever, independent of capacity change.
C8 (a) Supply Chain Models + Smartphone Case | (b) Speculative vs JIT Purchasing 10 marks
Asked in: Repeated in 2 of 7 sources
(a) Supply Chain Models
Supply Chain ModelDescriptionBest Suited For
Continuous Flow ModelHigh-volume, stable-demand production running continuouslyCommodities, staple FMCG with predictable demand
Efficient Chain ModelFocused purely on cost minimisation via economies of scaleHighly competitive, low-margin, price-sensitive markets
Fast Chain ModelPrioritises speed-to-market for short life-cycle/trend productsFashion apparel, seasonal/trend-driven goods
Agile ModelHighly flexible, responds quickly to unpredictable demand shiftsInnovative/customised products, volatile demand
Custom-Configured ModelStandard modules configured to order late (postponement)Mass customisation, e.g. computers, vehicles
Recommendation for a 6-month-life-cycle Smartphone: combines two pressures — must reach market extremely fast, and must be produced in high volume. Best served by the Fast Chain Model, prioritising speed over pure cost, supplemented by Agile Model elements to absorb demand-forecast uncertainty. Favour a compact supplier network near final assembly, pre-qualify component suppliers before launch, build modest capacity buffers, and keep near-real-time info flow between retail sell-through and the factory floor — trading some cost efficiency for market responsiveness, since the real risk is obsolescence/unsold stock at next-model launch, not marginal unit cost.
(b) Speculative Purchasing vs JIT (Zero-Stock) Buying — Volatile Market
AspectSpeculative PurchasingJIT (Zero-Stock) Buying
Primary GoalExploit expected price rises / secure scarce supplyMinimise carrying cost and working-capital lock-up
Advantage (volatile mkt)Locks in low cost before rises; insulates from short-term shortagesAvoids being caught holding high-cost stock if prices fall; keeps firm nimble
Risk (volatile mkt)If prices fall instead, stuck with excess, expensive inventoryIf supply disrupted/lead times lengthen, faces stock-outs, no buffer
Capital ImpactTies up significant working capital in advanceMinimal working capital tied up
DependenceLess dependent on supplier reliability once stockedHighly dependent on supplier reliability, short lead times
Conclusion: the two sit at opposite ends of a risk spectrum — speculative buying trades price risk for supply security, JIT trades supply risk for capital efficiency. Many firms hybridise: JIT for standard reliably-supplied items, selective speculative buying for critical inputs with high volatility and a trusted price-direction forecast.
C9 Replacement of Industrial Assets — Reasons & Worked Deterioration Examples 10 marks
Asked in: Repeated in 3 of 7 sources
Reasons for Replacement: Deterioration (wear-and-tear raises maintenance cost, cuts output/quality), Obsolescence (newer tech makes the asset uncompetitive though functional), Sudden failure (repeated repair costs exceed replacement), Inadequacy (can't meet growing capacity/quality needs).
BasisGradual DeteriorationSudden Failure
Failure PatternProgressive — performance/cost worsen steadily with ageRandom/age-independent — works fine until it abruptly stops
ExamplesMachine tools, vehicles, enginesElectronic components, light bulbs, fuses
Analytical ApproachMinimise average annual (total) cost — replace when average cost is lowestProbabilistic — group vs individual replacement policy, based on failure-time distribution
Worked Example 1 — Deteriorating Item (Average Cost Method), no resale value:
Machine costs ₹1,750; maintenance = 0 in Yr1, rising ₹100/yr thereafter.
YearMaint. CostCumulative Maint.DepreciationTotal CostAvg Cost/Year
100175017501750.00
210010017501850925.00
320030017502050683.33
430060017502350587.50
5400100017502750550.00
6500150017503250541.67
7600210017503850550.00
8700280017504550568.75
Average cost is lowest in Year 6 (₹541.67) then rises — replace at the end of Year 6. Worked Example 2 — with declining resale value:
YearMaint. CostCumulative Maint.Resale ValueTotal Cost*Avg Cost
110001000400050005000.00
213002300200083004150.00
3170040001200108003600.00
422006200600136003400.00
529009100500166003320.00
6380012900400205003416.67
*Total Cost = (Purchase Price ₹8,000 + Cumulative Maintenance) − Resale Value. Average cost is minimum in Year 5 (₹3,320) — replace at end of Year 5. Including a declining resale value shifts the optimal replacement point earlier than the no-resale case above.
C10 Project Management — Concept & Phases of the Project Life Cycle 10 marks
Asked in: Repeated in 3 of 7 sources
Project management is applying knowledge, skills, tools and techniques to project activities to meet/exceed stakeholder needs. Unlike routine operations, a project is a temporary endeavour with a defined start/end, unique deliverable, and constraints on scope, time, cost and quality (the 'triple constraint'/project-management triangle). 5 Phases of the Project Life Cycle: 1. Initiation — business idea, goals, purpose defined; feasibility/business case justifies proceeding. Getting this wrong means solving the wrong problem however well later executed. 2. Planning — scope, roles, schedule (WBS, Gantt, network diagram), budget charted in detail. Widely regarded the most critical phase — inadequate planning is the single most common cause of overrun/failure. 3. Launch and Execution — resources allocated, actual deliverable work carried out per plan. Consumes most of the budget/time; tests the PM's coordination/leadership most. 4. Performance Check and Control — progress tracked against plan; quality checks, compliance, cost tracking, risk/issue management, often in parallel with execution. Catches deviations early before they compound into major overruns. 5. Completion/Closure (Handover) — final deliverables approved, documented, handed over; team released, lessons learned captured. A rushed/skipped closure leaves loose ends (defects, missing docs, no sign-off) that resurface later. Project Manager's Responsibilities: budgeting/cost control, resource allocation across competing tasks, tracking expenditure vs budget, managing schedule/priorities/resource conflicts. Note: handling day-to-day customer complaints is NOT a core PM responsibility — that falls to customer-service/operations once the deliverable is live. Overall Significance: treating a project as a disciplined life cycle (vs unstructured activity) lets an organisation catch scope/cost/quality problems at the cheapest point (early), align stakeholder expectations up front, and ensure controlled, documented handover — materially raising the odds of successful, on-time, on-budget completion.
C11 (a) Macro vs Micro-Motion Study, Therbligs & SIMO Charts | (b) Observed → Standard Time (Worked) 10 marks
Asked in: Repeated in 2 of 7 sources
(a) Macro-Motion vs Micro-Motion Study
BasisMacro-Motion StudyMicro-Motion Study
Level of DetailJob as a whole, broken into fairly large, visible elementsJob broken into smallest elemental hand/body motions (Therbligs)
MethodDirect time study using a stopwatch, normal-speed observationFrame-by-frame film/video analysis, often high-speed
PurposeSets time standards for typical, longer-cycle jobsFine-tunes extremely short, repetitive, high-frequency motions
Cost/EffortRelatively quick and inexpensiveTime-consuming, needs specialised recording equipment
Micro-motion study is most beneficial for very short-cycle, highly repetitive tasks (assembly-line manual operations, electronic-component insertion, garment stitching), where fraction-of-a-second savings per cycle, multiplied over thousands of daily repetitions, yield significant productivity gains. Not economically justified for one-off/low-volume jobs. Therbligs — 17-18 fundamental hand/body motions (Gilbreth spelled backwards, roughly) into which any manual task decomposes — e.g. Search, Select, Grasp, Transport Loaded, Position, Assemble, Release Load, Transport Empty, Hold. Recording a job as Therbligs lets an analyst eliminate non-value-adding motions (Search, excessive Hold) and re-sequence for maximum smoothness/minimum fatigue. SIMO (Simultaneous Motion) Charts record, on a common time scale, the Therbligs performed simultaneously by both hands (sometimes feet), making idle time on one hand visible while the other works — central to methods engineering on high-volume assembly work.
(b) Observed Time → Standard Time — Process & Worked Example
Step 1 — Observed Time (OT): stopwatch-recorded time per job element, averaged across several cycles. Step 2 — Performance Rating Factor (RF): normalises for the observed worker being faster/slower than a 100%-standard worker. Normal Time (NT) = OT × RF/100. Step 3 — Allowances (added on top of NT): Personal (washroom/water, ~2-5% of shift), Fatigue (physical/mental tiredness, 12-20%+ for strenuous work), Delay (unavoidable interruptions), Contingency (occasional items like tool sharpening), Interference (worker tending multiple machines), Policy (special, used sparingly). Step 4 — Standard Time (ST) = NT + Allowances = NT × (1 + Allowance %). Worked Example (5 elements, 15% allowance):
ElementObserved TimeRating FactorNormal Time (OT×RF)
10.780%0.56
20.8100%0.80
31.3120%1.56
40.590%0.45
51.2100%1.20
Total——4.57 min
Normal Time = 4.57 min. Standard Time = 4.57 × 1.15 = 5.26 minutes — the figure production planning, capacity calculations and wage-incentive schemes are ultimately based on.
C12 Statistical Quality Control (SQC) & Control Charts — Worked C-Chart and p-Chart 10 marks
Asked in: Repeated in 2 of 7 sources
SQC applies statistical methods to monitor/control a process, distinguishing natural, random ('common-cause') variation always present in any process, from abnormal, assignable ('special-cause') variation signalling something has gone wrong. Control charts plot a process characteristic over time against a Centre Line (CL, process average) and statistically-derived Upper/Lower Control Limits (UCL/LCL, typically ±3 standard deviations). Points randomly within limits = process 'in control'; a point outside (or a clear non-random pattern) signals an assignable cause needing investigation. Worked Example 1 — C-Chart (defects per unit):
10 fabric-roll samples show defects: 4, 6, 5, 3, 7, 4, 6, 5, 4, 6. c̄ (Centre Line) = Total defects / Samples = 50/10 = 5.0 UCL = c̄ + 3√c̄ = 5.0 + 3√5.0 = 5.0 + 6.71 = 11.71 LCL = c̄ − 3√c̄ = 5.0 − 6.71 = −1.71 → taken as 0 (can't be negative) Interpretation: every sample (3-7) lies within the control limits (0-11.71) → process statistically under control, normal common-cause variation only. Worked Example 2 — p-Chart (fraction defective):
10 lots of 300 items each; defectives = 25,30,35,40,45,35,40,30,20,50. p̄ = Total defectives / (Lots × lot size) = 350/3000 = 0.1167 UCL = p̄ + 3√[p̄(1−p̄)/n] = 0.1167 + 0.0556 = 0.1723 LCL = p̄ − 3√[p̄(1−p̄)/n] = 0.1167 − 0.0556 = 0.0611 Interpretation: all ten fractions defective (0.0667-0.1667) lie within 0.0611-0.1723 → process under control, no assignable-cause spike. Practical Significance: Control charts let quality staff distinguish real process problems from statistical noise, avoiding two costly mistakes — chasing 'phantom' problems (over-control) and ignoring genuine assignable-cause problems (under-control). This is the foundation for Six Sigma, TQM and ISO 9000 process-capability analysis.
C13 Types of Inventories & Inventory Costs Influencing Management Decisions 10 marks
Asked in: Repeated in 3 of 7 sources
A. Direct Inventories — items directly consumed in/forming part of the final product: Raw Material (inputs awaiting conversion), WIP (partially finished items — controlling WIP maintains uniform production, gives scheduling flexibility, reduces handling cost), Finished Goods (completed products awaiting dispatch — buffers demand fluctuation, allows scheduling independent of exact order timing), MRO (spares/consumables not part of final product), Miscellaneous (scrap, obsolete stock, stationery). B. Indirect Inventories — needed for production but never physically part of the finished good: Transportation/Pipeline (in transit), Buffer/Safety (against demand/lead-time uncertainty), Decoupling (between successive processes so a stoppage at one doesn't halt the next), Seasonal (built ahead of a known demand spike), Lot-Size/Cycle (for bulk-discount advantage), Anticipation (stocked ahead of a known event, e.g. planned shutdown). Types of Inventory Cost:
Cost TypeDescriptionBehaviour as Order Size Rises
Ordering CostCost of placing/processing a purchase order — paperwork, transport, inspection on receiptFalls (fewer orders needed per year)
Carrying (Holding) CostCost of storing inventory — warehousing, insurance, obsolescence, opportunity cost of capitalRises (more average stock held)
Shortage (Stock-out) CostCost of failing to meet demand from stock — lost sales, expediting, lost goodwillIndependent of order size; driven by safety-stock policy
Purchase/Unit CostPrice per unit, may fall with bulk-purchase discountsMay fall in steps at discount break-points
Influence on Decisions: since ordering cost falls and carrying cost rises as order quantity grows, managers can't minimise either in isolation — minimising ordering cost alone (rare, huge batches) pushes carrying cost too high, and vice versa. This is precisely the trade-off the EOQ model formalises: it finds the order quantity minimising total cost (ordering + carrying). Shortage cost separately drives the safety-stock decision — made in combination with, but independently of, the EOQ-based reorder quantity, since safety stock protects against demand/lead-time uncertainty rather than the fixed-cost trade-off EOQ addresses.